Araneta City Cyberpark

This P15-billion mega project offers a total of 550,000 gross floor area of prime office space in an eight-hectare PEZA-registered IT Zone location.

Araneta City Cyberpark is currently composed of two high-rise buildings, with three additional towers soon to rise.

View Virtual Tour

layout styles
Cyberpark 2

The first building completed in the development is the CyberPark 1, which has 29 levels of prime office spaces, three levels of retail, and three levels of basement parking. Compliant to the green building code of Quezon City, this 90,000 sq.m PEZA-registered tower has 100% back-up generator power, multiple telecom service providers that ensure high-speed telecom backbone access to itstenants.

Office locators include Accenture, 24/7 Intouch, Stellar Philippines, Genesys Telecommunications, and Sterling Talent Solutions.


Cyberpark 2

Completed in 2018, CyberPark 2 is the second PEZA–registered tower in the development, which has retail spaces and dining areas at the ground floor and second floor, prime office spaces from the 3rd to the 30th floors, three levels of basement parking, and a roof deck.

It is an environment-friendly building that uses double-glazed energy-efficient windows to reduce heat penetration and features a rainwater recovery system.

Cyberpark 2

Cyberpark-3
Cyberpark 2

Cyberpark Tower 3 will soon rise on the site of former Alorica Building. The tower will be similarly designed to Cyberpark Tower 2, featuring double-glazed energy-efficient windows, smart elevators, vertical trellises, balconies with planters, and a rainwater recovery system.